VIDEO: £750K repairs complete at flood-hit Hebden Bridge

VIDEO: £750K repairs complete at flood-hit Hebden Bridge
 

0 Have your say The A646 Falling Royd on Burnley Road in Hebden Bridge is now fully open to two-way traffic, as works to repair the flood-damaged road and retaining wall are complete.
The Boxing Day 2015 floods caused a 30-metre long crack in the road after a supporting concrete beam slipped down the hill.
Although the road remained open, it was reduced to one lane with temporary traffic lights due to the extent of the damage and the complex engineering works required.
Calderdale Council was keen to not only repair the road and wall, but also to make them more resilient.
The hillside has... read more

 
5 October 2016 in Yorkshire & Humber, Views: 29
Share:
  •  





    News Widget for Webmasters



    Bring Eugene's son back home immediately

    Realtime News

     

    «
    »
    Mo Tu We Th Fr Sa Su
          1 2 3 4
    5 6 7 8 9 10 11
    12 13 14 15 16 17 18
    19 20 21 22 23 24 25
    26 27 28 29 30 31